Project 1 : INDUSTRIAL MAINTENANCE
Customer : Cement works
COLACEM (CAT)
Repair by refill and machining a roller carrying cement furnace with a diameter 1700 mm and ultrasonic’s inspection of treads of furnace.
|
|
Refill and machining a roller
carrying cement furnace |
Ultrasonic’s inspection
of treads of furnace |
+--------------------------------------------------------------------------+
Project 2 :
INDUSTRIAL SAFETY
Customer : SOCIETE NATIONALE DE DISTRIBUTION DES PETROLES (SNDP)
SNDP choose following an international call for tender SIS for the preliminary study for the construction of LPG depot related to the dangers and the internal operation plan (I.O.P)
Site of the future propane depot of Gabes, SNDP
|
+--------------------------------------------------------------------------+
Project 3 :
ELECTRIC STUDIES
Customer : SOTIPAPIER
For the realization of his project of cogeneration to their factory in Belli, SOTIPAPIER entrusted to SIS three actions:
- Study of an electric connection to the network 30 Kv, the two gas turbines groups synchronization, between them and with the network, counting, protections and tele-control,
- Conduct staff training.
- Predictive maintenance of the natural gas HP station.
+--------------------------------------------------------------------------+
Project 4 : GAS NETWORK STUDIES
Customer : BRITISH GAS Tunisia (BGT)
Connecting the gas treatment station Hasdrubal to the STEG gas pipeline Ben Sahloun (16 km) and of the LPG pipe connecting the gas treatment station Hasdrubal to BGT terminal in Gabes (130 km).
- Plotting study.
- Preparation of the topographic plans.
- Owners’ identification.
- Lands expertise.
-
The negotiation with the owners and the signature of the constraints agreements.
Preparation of the public utility decree to be submitted to the DGE/MIEPM.
+--------------------------------------------------------------------------+
Project 5 :
GAS IN LOAD CONNECTION
Customer : PERENCO
Connection of the gas pipelines and condensate of Oum Chiah to STEG networks.
- Weldings of two prickings on STEG gas pipelines and condensate (under pressure).
-
Drilling of two prickings in load.
+--------------------------------------------------------------------------+
Project 6 : GAS IN LOAD CONNECTION
Customer : WINSTAR
- Realization of 7 prickings in load on the pipe between Chouech Essaida and El Bourma.
- weldings of 7 prickings in load, a pricking every 10 km.
-
Drilling of the prickings in load
Drilling in load machine |
Works on gas in load network |
+--------------------------------------------------------------------------+
Project 7 : REVAMPING GAS
Customer : SEREPT
Technical assistance to the revamping project of ASHTART platform, by the assignment of highly qualified staff during 3 years.
|